SITE PREPARATION OF PGTL PROJECT

Client: NPC
Consultant Engineering: Rah shahr consultant engineers
Contractor: FKJ
Site Location: PGTL plant, Asalooyeh
Contract Price: 50,500,000,000 Rls
Contract Duration: 12 months

Bill Of Quantities

Description Quantity Unit
Excavation in hard lands with mechanical facilities and transportation up to 20m from centre of excavation 4,000,000 M3
Loading and transportation of excavated material from soft, hard or rock grounds and surplus material from sieving up to 100m from centre of excavation and unloading. 6,900,000 M3
Transportation of excavated material from soft, hard or rock grounds and surplus material from sieving, incase the distance of transportation is between 100m to 500m 18,900,000 m3/km
Transportation of excavated material from soft, hard or rock grounds and surplus material from sieving, incase the distance of transportation is between 500m to 10000m 5,082,000 m3/km
Transportation of water incase the distance of transportation is more than 1 km. 2,610,000 m3/km
Spreading, watering and compaction of filling layers and 95% compaction for a thickness to 15 cm 2,900,000 M3